Suzlon to Develop 48.3 MW Wind Power Project for Adani Green Energy
Suzlon Group has secured an order from Adani Green Energy Ltd. (AGEL) to develop a wind power project of 48.3 MW capacity. This information was given by Suzlon in a stock filing dated 18th October 2022.
Scope of work for Suzlon entails the supply and installation of 23 wind turbine generators, each of 2.1 MW capacity. These will be supplied along with Hybrid Lattice Tubular (HLT) towers. The project is to be developed in Mandvi, located in the Kutch region of Gujarat.
Suzlon expects this project to be commissioned in 2023. Once commissioned, Suzlon will provide subsequent Operations and Maintenance (O&M) services for this project.