RVUNL Floats 3,900 Cr. Tender for Solar Power Projects in Bikaner
Rajasthan Rajya Vidyut Utpadan Nigam Ltd. (RVUNL) has invited bids for the development of solar projects in Bikaner. As per the tender, estimated cost for developing these projects is Rs. 3,900 crore.
These projects will have a collective generation capacity of 810 MW, and will be located in RVUNL’s Ultra Mega Solar Park, village Ramsar Chhota of Bikaner’s Tehsil Pugal. These solar power projects shall be State Transmission Utility (STU) – connected. Successful bidders will be selected by means of Tariff Based Competitive Bidding (TBCB).
Last date to submit bids for this tender is 22nd February 2023.